Date: 06/19/2009 Views: 3297
Date: 11/29/1999 Views: 5163
Date: 08/06/2007 Views: 3811
Date: 08/23/2023 Views: 181271
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.