Date: 05/22/2009 Views: 3904
Date: 12/31/1969 Views: 2945
Date: 04/14/2005 Views: 5660
Date: 08/23/2023 Views: 160320
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.