Date: 12/22/2008 Views: 3862
Date: 04/25/2007 Views: 3318
Date: 09/18/2006 Views: 3600
Date: 08/23/2023 Views: 188826
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.