Date: 09/18/2010 Views: 3015
Date: 02/01/2009 Views: 3194
Date: 08/26/2010 Views: 1903
Date: 08/23/2023 Views: 183305
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.