Date: 01/21/2003 Views: 4025
Date: 10/11/2009 Views: 2594
Date: 10/29/2009 Views: 2673
Date: 08/23/2023 Views: 97110
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.