Date: 09/19/2010 Views: 3246
Date: 10/30/2007 Views: 6727
Date: 03/21/2009 Views: 3670
Date: 08/23/2023 Views: 182767
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.