Date: 05/15/2008 Views: 3857
Date: 08/12/2003 Views: 6048
Date: 05/10/2015 Views: 9325
Date: 08/23/2023 Views: 219442
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.