Tank cleaning, through vent and sender with borescope.
Date: 06/28/2010
Views: 6555
Tallin EETN Estonia
Date: 06/07/2005
Views: 4256
Newest Image
EAA SITE
Date: 08/23/2023
Views: 214709
WingSet98Ann
Started the installation of the flap operating cross tube by drilling a pair of holes on each side of the fuselage where the cross tube will eventually emerge to engage the flap operating pins. The port side preliminary openings for the flap operating cross tube.