Date: 06/07/2007 Views: 3553
Date: 05/17/2009 Views: 3741
Date: 06/12/2010 Views: 3517
Date: 08/23/2023 Views: 127379
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09