Date: 10/25/2009 Views: 2101
Date: 06/15/2008 Views: 2361
Date: 05/30/2012 Views: 2874
Date: 08/23/2023 Views: 86997
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09