Date: 12/31/1969 Views: 2649
Date: 02/24/2005 Views: 2625
Date: 11/20/2010 Views: 3028
Date: 08/23/2023 Views: 164720
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.