Date: 09/21/2008 Views: 5803
Date: 09/15/2009 Views: 8669
Date: 12/12/2008 Views: 7195
Date: 08/23/2023 Views: 723191
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09