Date: 12/31/1969 Views: 4737
Date: 12/24/2013 Views: 8658
Date: 05/30/2005 Views: 4236
Date: 08/23/2023 Views: 857745
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.