Date: 12/31/1969 Views: 2294
Date: 11/13/2010 Views: 2920
Date: 07/29/2007 Views: 2307
Date: 08/23/2023 Views: 102323
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.