Date: 12/01/2004 Views: 3602
Date: 09/28/2007 Views: 4442
Date: 05/04/2009 Views: 3040
Date: 08/23/2023 Views: 194164
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.