Date: 12/31/1969 Views: 3553
Date: 07/08/2004 Views: 2547
Date: 12/05/2005 Views: 4237
Date: 08/23/2023 Views: 162668
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.