Date: 12/31/1969 Views: 3512
Date: 09/10/2009 Views: 4411
Date: 03/22/2007 Views: 4073
Date: 08/23/2023 Views: 179507
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.