Date: 04/26/2007 Views: 4618
Date: 09/03/2004 Views: 2193
Date: 10/20/2010 Views: 3413
Date: 08/23/2023 Views: 159731
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.