Date: 01/21/2004 Views: 3280
Date: 04/22/2012 Views: 10536
Date: 06/28/2009 Views: 2397
Date: 08/23/2023 Views: 99933
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.