Date: 06/06/2005 Views: 3165
Date: 12/31/1969 Views: 2794
Date: 12/01/2008 Views: 3063
Date: 08/23/2023 Views: 160732
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.