Date: 08/30/2006 Views: 3039
Date: 10/11/2009 Views: 2743
Date: 08/26/2010 Views: 1502
Date: 08/23/2023 Views: 105230
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.