Date: 12/31/1969 Views: 2361
Date: 10/17/2009 Views: 4400
Date: 02/04/2013 Views: 4030
Date: 08/23/2023 Views: 93235
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.