Date: 12/31/1969 Views: 2575
Date: 07/31/2004 Views: 3908
Date: 02/21/2011 Views: 1668
Date: 08/23/2023 Views: 97367
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.