Date: 01/16/2005 Views: 2973
Date: 12/31/1969 Views: 3082
Date: 03/15/2008 Views: 3549
Date: 08/23/2023 Views: 218737
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.