Date: 11/29/1999 Views: 3548
Date: 04/11/2010 Views: 2765
Date: 12/31/1969 Views: 2843
Date: 08/23/2023 Views: 95930
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.