Date: 12/31/1969 Views: 2531
Date: 11/24/2007 Views: 3932
Date: 09/18/2010 Views: 2823
Date: 08/23/2023 Views: 105894
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.