Date: 01/21/2010 Views: 3068
Date: 05/23/2007 Views: 6391
Date: 10/21/2003 Views: 3435
Date: 08/23/2023 Views: 158420
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.