Date: 10/26/2008 Views: 3150
Date: 12/31/1969 Views: 3920
Date: 06/01/2008 Views: 2851
Date: 08/23/2023 Views: 196881
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.