Date: 12/31/1969 Views: 3086
Date: 05/27/2016 Views: 8173
Date: 08/29/2005 Views: 3277
Date: 08/23/2023 Views: 159482
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.