Date: 11/03/2004 Views: 3373
Date: 10/30/2007 Views: 4092
Date: 11/28/2006 Views: 3535
Date: 08/23/2023 Views: 195857
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.