Date: 09/21/2005 Views: 3514
Date: 12/31/1969 Views: 4231
Date: 10/27/2009 Views: 4168
Date: 08/23/2023 Views: 208832
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.