Date: 03/11/2004 Views: 3232
Date: 04/10/2012 Views: 10498
Date: 10/30/2007 Views: 4637
Date: 08/23/2023 Views: 93427
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.