Date: 05/15/2010 Views: 3863
Date: 03/24/2009 Views: 2826
Date: 12/31/1969 Views: 2923
Date: 08/23/2023 Views: 159765
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.