Date: 12/31/1969 Views: 2833
Date: 06/23/2004 Views: 3865
Date: 04/28/2008 Views: 6477
Date: 08/23/2023 Views: 158500
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09