Date: 10/05/2007 Views: 4870
Date: 08/21/2008 Views: 3734
Date: 05/17/2013 Views: 9063
Date: 08/23/2023 Views: 210179
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09