Date: 02/18/2007 Views: 3364
Date: 03/07/2009 Views: 3008
Date: 05/02/2008 Views: 3063
Date: 08/23/2023 Views: 200476
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09