Date: 08/17/2004 Views: 2380
Date: 08/03/2013 Views: 3817
Date: 11/29/1999 Views: 6132
Date: 08/23/2023 Views: 170175
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09