Date: 12/13/2004 Views: 3883
Date: 10/29/2005 Views: 3667
Date: 03/12/2012 Views: 6805
Date: 08/23/2023 Views: 170890
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09