Date: 11/08/2008 Views: 3807
Date: 11/29/1999 Views: 3208
Date: 12/31/1969 Views: 3538
Date: 08/23/2023 Views: 195094
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09