Date: 08/22/2008 Views: 3575
Date: 09/02/2010 Views: 2575
Date: 08/03/2003 Views: 3996
Date: 08/23/2023 Views: 158487
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09