Date: 01/26/2013 Views: 7179
Date: 04/18/2013 Views: 5955
Date: 05/14/2007 Views: 3510
Date: 08/23/2023 Views: 102375
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09