Date: 11/04/2007 Views: 4195
Date: 11/05/2006 Views: 2693
Date: 08/17/2010 Views: 3430
Date: 08/23/2023 Views: 95754
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09