Date: 09/22/2005 Views: 3514
Date: 07/08/2014 Views: 4522
Date: 03/10/2011 Views: 1977
Date: 08/23/2023 Views: 159741
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09