Date: 06/13/2004 Views: 3630
Date: 03/03/2004 Views: 2818
Date: 05/20/2009 Views: 3047
Date: 08/23/2023 Views: 102327
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09