Date: 12/31/1969 Views: 2605
Date: 02/15/2009 Views: 6382
Date: 12/31/1969 Views: 2712
Date: 08/23/2023 Views: 86485
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09