Date: 02/20/2009 Views: 4024
Date: 07/17/2009 Views: 2894
Date: 09/09/2007 Views: 5536
Date: 08/23/2023 Views: 160700
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09