Date: 08/08/2010 Views: 2547
Date: 12/04/2007 Views: 4784
Date: 11/12/2009 Views: 2911
Date: 08/23/2023 Views: 189591
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09