Date: 09/18/2010 Views: 3082
Date: 08/11/2009 Views: 3319
Date: 04/10/2015 Views: 11771
Date: 08/23/2023 Views: 186229
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09