Date: 10/11/2009 Views: 2925
Date: 12/31/1969 Views: 2440
Date: 01/14/2010 Views: 3568
Date: 08/23/2023 Views: 196211
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09