Date: 05/23/2009 Views: 3689
Date: 08/10/2009 Views: 3577
Date: 03/31/2009 Views: 4022
Date: 08/23/2023 Views: 207262
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09